Advertisements

Reese-Exterior Envelope Repairs

Submittals are due by 2:00 p.m., Tuesday, February 14, 2023.
Do not transmit any submittal information via email. Please deliver one copy of the submittal, along with one electronic copy in pdf format USB.

PROJECT DESCRIPTION:
The Rowe building was constructed in 1982 on the UNC Charlotte campus. An internal assessment of the condition of the exterior walls and windows found deteriorated conditions around the existing aluminum windows and curtainwall system that are leaking. This project will replace the exterior existing aluminum windows and curtain wall systems to protect the interior of the building from the external environment and reduce energy costs.

Mailed Proposals:

Attn: Mrs. La’Keya Hewlin – Capital Projects

The University of North Carolina at Charlotte

Facilities Management – Capital Projects

9201 University City Boulevard

Charlotte, NC 28223-0001

Or

Hand Delivered:

Attn: Mrs. La’Keya Hewlin – Capital Projects

Facilities Management/ Police Building 

2nd Floor – Capital Projects

9151 Cameron Boulevard

Charlotte, NC 28223


Roof Replacements- Multiple Buildings

Submittals are due by 2:00pm, Wednesday, February 8, 2023.
Do not transmit any submittal information via email. Please deliver one copy of the submittal, along with one electronic copy in pdf format USB

PROJECT DESCRIPTION:
The proposed project if for the design and construction of a roof replacements for Grounds Building,
Denny, Garinger and Robinson Hall, all located on the UNC Charlotte campus. Replacement of the
exiting roofs will include roof insulation, flashings, caulking, copings, roof leaders as evaluated and
needed for each building.

Mailed Proposals:

Attn: Mrs. La’Keya Hewlin – Capital Projects

The University of North Carolina at Charlotte

Facilities Management – Capital Projects

9201 University City Boulevard

Charlotte, NC 28223-0001

Or

Hand Delivered:

Attn: Mrs. La’Keya Hewlin – Capital Projects

Facilities Management/ Police Building 

2nd Floor – Capital Projects

9151 Cameron Boulevard

Charlotte, NC 28223


Woodward-Controls & Lab HVAC Modernization

Submittals are due by 2:00 p.m., Wednesday, February 8, 2023.
Do not transmit any submittal information via email. Please deliver one copy of the submittal, along with one electronic copy in pdf format USB.

PROJECT DESCRIPTION:
The proposed project is for Woodward Controls upgrades as the current systems are outdated. The upgrades to the Woodward controls will include design for the following:
• New LON controllers on VAV’s, AHU's and miscellaneous equipment
• New pneumatic actuators to electric (Dampers and valves on Ahu's)
• Upgrades Phoenix controls from Pneumatic to DDC
• Replacement of Vivarium Room DP sensors with monitors with local displays and door monitoring
• Review design of Glycol system for AHU’s s 5&6 as current units do not have supplemental heat (history of tripping freeze-stat)
• Design team will investigate issues associated with building steam system serving building lab equipment and provide recommendations and costs for implementation. If approved by the University, provide design for recommendations made by the design team

Mailed Proposals:

Attn: Mrs. La’Keya Hewlin – Capital Projects

The University of North Carolina at Charlotte

Facilities Management – Capital Projects

9201 University City Boulevard

Charlotte, NC 28223-0001

Or

Hand Delivered:

Attn: Mrs. La’Keya Hewlin – Capital Projects

Facilities Management/ Police Building
2nd Floor – Capital Projects

9151 Cameron Boulevard

Charlotte, NC 28223


Cameron Roof and Window Replacement

Submittals are due by 2:00 p.m., Thursday, February 9, 2023.
Do not transmit any submittal information via email. Please deliver one copy of the submittal, along with one electronic copy in pdf format USB

PROJECT DESCRIPTION:
The proposed project if for the design and construction of a roof and window replacement for Cameron
located on the UNC Charlotte campus. The proposed roof and window replacements are to improve
energy efficiency and reduce operation costs.
The 2 nd and 3 rd story roofs are proposed for replacement and are currently ballasted EPDM roofs and
approximately 35,000 SF in size total.
The existing fixed aluminum windows and curtain wall system need replacement and consist of
approximately 4,000 of glazing.

Any questions about the project should be directed via email to Jeanine Bachtel jbachtel@uncc.edu

Mailed Proposals:

Attn: Mrs. La’Keya Hewlin – Capital Projects

The University of North Carolina at Charlotte

Facilities Management – Capital Projects

9201 University City Boulevard

Charlotte, NC 28223-0001

Or

Hand Delivered:

Attn: Mrs. La’Keya Hewlin – Capital Projects

Facilities Management/ Police Building 

2nd Floor – Capital Projects

9151 Cameron Boulevard

Charlotte, NC 28223


Commissioning Agent for Atkins Library Tower ADA & Fire Smoke System Upgrades

Submittals are due by 2:00 p.m., Thursday, February 16, 2023.
Do not transmit any submittal information via email. Please deliver one copy of the submittal, along with one electronic copy in pdf format USB.

PROJECT DESCRIPTION:
The ADA scope will include: enlarging the two existing elevator shafts and replacing the elevators to meet ADA requirements, renovating the existing tower restrooms to meet building code and ADA requirements, replacing finishes to include paint and carpet for areas disturbed by the project improvements, and upgrading telecommunications/electrical/HVAC equipment as required for the ADA improvements.
The fire/smoke system upgrades scope will include: repairs and replacement of components associated with the buildings atrium and high-rise smoke control system, establishing a sequence of operations for the full building smoke control system, ensuring the complete building smoke control system operates as a single system, replacing or removing any failed or extraneous equipment, upgrading the dry valve in G76 which serves the dry sprinkler system at the loading dock, and replacing the fire pump controller.

Deliver Proposals to:

Attn: Mr. Attila Gergely

The University of North Carolina at Charlotte- Building 55

Facilities Management

9151 Cameron Boulevard

Charlotte, NC 28223