Advertisements
Smith Comprehensive Renovation – CMR
Submittals are due by 2:00 p.m., November 20, 2025. Pre-Proposal Meeting: The meeting will take place at 11am on Wednesday, November 5, 2025 in room 202 of the Smith building located at 319 Library Lane, Charlotte, NC 28223. Project Description:The project is the comprehensive renovation of a portion of Smith Hall, as indicated in the […]
RUP-4 HVAC & Controls
**UPDATE** Submittals are due by 2:00 p.m., November 12, 2025. Project Description:ControlsAll other electrical work necessary to complete the project.Replace obsolete BAS controls with EcoStruxure graphic front-end (Schneider Preferred)Replace sensors, flow meters. Original valves and actuators.MechanicalReplacement of the 300 Tons Chiller VFD.Installation of upstream power conditioner/power quality units upstream of the chiller.Installation of Water Side […]
Richardson Stadium Expansion Phase 2
**UPDATE** Bid Opening Group A:Wednesday, November 12, 2025 11:00 AM EST Bids for packages 2-04A through 2-09G UNC Charlotte’s Smith Building (319 Library Ln, Charlotte, NC 28262) in Room 202. Group B:Wednesday, November 12, 2025 3:00 PM EST Bids for packages 2-10B through 2-35A UNC Charlotte’s Belk College of Business (Friday Building -9209 Mary Alexander […]
Loy Witherspoon Center for Meditation and Reflection
A Pre-bid Meeting will be held on October 14th at 11:00 am. Bids are due on November 4th at 2:00 pm. Project Description:The scope of work includes construction of the new, approximately 1,460 square foot Loy Witherspoon Center for Meditation and Reflection, located on the campus of the University of North Carolina at Charlotte. The […]
Lynch Residence Hall Roof Replacement
Submittals are due by 2:00 p.m., October 16, 2025. Project Description:The proposed project is for the design and construction of roof replacement for Lynch Hall located on the UNC Charlotte campus. The current roof is fiberglass class A asphalt shingles approximately 38,714 square feet. Roof replacement will be determined in design to be accomplished within […]
Loy Witherspoon Center for Meditation and Reflection
A Pre-bid Meeting will be held on October 14th at 11:00 am. Bids are due on November 4th at 2:00 pm. Project Description:The scope of work includes construction of the new, approximately 1,460 square foot Loy Witherspoon Center for Meditation and Reflection, located on the campus of the University of North Carolina at Charlotte. The […]
Friday Active Learning Classrooms
Submittals are due by 2:00 p.m., October 16, 2025. Project Description:The project is for the renovation of existing tiered lecture classrooms in the Friday Building. Existingtiered lecture rooms will be renovated and converted into active learning classrooms for 72 students each.The design will be consistent with the Guiding Principles of the Campus Master Plan. The […]
Grigg HVAC & Controls
Submittals are due by 2pm on October 9, 2025. PROJECT DESCRIPTION:The project is to have the existing Pneumatic Actuators only replaced for the Chilled and Hot Watersystems in the building mechanical plant. Replacement of all Actuators and Valves on AHU’s 1 through10 including associated smoke dampers. Xenta controls in Cleanrooms removed/demoed and replacedwith new full […]
Stormwater Master Plan Implementation, Phase 2
**UPDATE-TIME CHANGE** Submittals are due 5:00pm on October 16, 2025. PROJECT DESCRIPTION:The University is under the City of Charlotte’s stormwater permit. As such, it must comply with the City’s Post Construction Stormwater Ordinances. Analysis completed as part of the Stormwater Master Plan shows that the University must increase the built upon area (BUA)that is treated by […]
Burson Renovation and Expansion
**UPDATE** Re-bid 21-A Fire Suppression (FINAL RE-BID)Bids due- 11AM, Thursday, October 23rd The 21-A Fire Suppression bid package will have a final re-bid next Thursday, October 23 @ 11AM (EST). Drop off of bid packages is available starting at 10AM (EST) until the deadline at the updated bid drop off location. If a trade partner […]