Designer Solicitations
Robinson Humidity and Boiler Replacement
Tags: Designer Solicitations;
Submittals are due by 2:00 p.m., April 30, 2026.
This project will perform work on existing HVAC systems in Robinson Hall to control humidity in critical spaces. The majority of this building’s systems are original and have surpassed their expected life cycle. Airflow monitoring to be added to buildings AHUs throughout in addition, this project will replace end of life boilers, including one currently leaking. This will improve the building’s ability to provide heating to the building. It will also include a full TAB of the building.
Dubois Center Energy Efficiency Controls Upgrade
Tags: Designer Solicitations;
Submittals are due by 2:00pm, April 29, 2026.
This project will include the replacement of the Dubois Center HVAC Controls. The majority of the building’s systems are original and have surpassed their expected life cycle. The project will include energy efficient controls strategies to improve the overall energy efficiency of the HVAC system as well as people counters that will control building ventilation. Pre functional testing of HVAC and control systems in design for system deficiencies and fully rebalance the system.
University Pond Enhancement Project
Tags: Designer Solicitations;
Submittals are due by 2:00 p.m., April 9, 2026.
The project is for the enhancement of the University’s Pond located at 8922 N Tryon St, Charlotte, NC. Part of the pond is also on the property of Atrium Health University City.
The design will be consistent with the University’s Design & Construction Manual, found at: http://facilities.uncc.edu/DCManual