East Village Infrastructure Upgrades – Notice to Bidders

Shiel Sexton Company will be accepting sealed bids from prequalified 1st tier subcontractors only for the following trade packages; BP 01 Site Work; BP 02 Electrical; BP 03 Landscaping, until 1:30 p.m. Thursday, October 22, 2020 October 29, 2020 Tuesday, November 3, 2020.

A non-mandatory Pre-bid Meeting will be conducted via Zoom Video at 2:00 p.m. Tuesday, September 22, 2020. Note: Special bid submittal procedures in place during COVID-19 Crisis.

Pre-bid Meeting PowerPoint Presentation posted 09/24/2020

Addendum 1 posted 09/29/2020

Addendum 2 posted 10/07/2020

Addendum 3 posted 10/16/2020

Addendum 4 posted 10/22/2020

Addendum 5 posted 10/27/2020

Attachment Size
PDF icon EVI Notice To Bidders.pdf 151.64 KB
PDF icon EVI Pre-Qualified Subs List -6-15-20 Updated.pdf 124.79 KB
PDF icon EVI Pre-Bid Meeting 9-22-20 Presentation.pdf 5.3 MB
PDF icon Addendum 1 – UNCC East Village Infrastructure – 9-29-20.pdf 5.88 MB
PDF icon Addendum 2 – East Village Infrastructure.pdf 84.45 KB
PDF icon Addendum 3 – UNCC East Village Infrastructure – 10-16-20.pdf 1.68 MB
PDF icon Addendum 4 – East Village Infrastructure – 10-22-20 (1).pdf 81.82 KB
PDF icon Addendum 4 – Responses to EVI BID RFI Log – 10-22-20 (2).pdf 463.52 KB
PDF icon Addendum 4 – EVI Bid Day Checklist (1).pdf 222.85 KB
PDF icon E-1 – SCHEDULES & NOTES (1).pdf 882.03 KB
PDF icon E-2 – OVERALL ELECTRICAL PLAN.pdf 1.35 MB
PDF icon E-3 – ELECTRICAL DETAILS.pdf 553.91 KB
PDF icon E-4 – ELECTRICAL DETAILS.pdf 1.07 MB
PDF icon E-4.1 – ELECTRICAL DETAILS.pdf 484.96 KB
PDF icon E-5 – ELECTRICAL PLANS.pdf 969.97 KB
PDF icon E-6 – ELECTRICAL PLANS.pdf 887.39 KB
PDF icon E-8 – ELECTRICAL PLANS.pdf 1.03 MB
PDF icon E-9 – ELECTRICAL PLANS.pdf 1.11 MB
PDF icon E-10 – ELECTRICAL PLANS.pdf 984.07 KB
PDF icon E-11 – ELECTRICAL PLANS.pdf 804.56 KB
PDF icon E-12 – ELECTRICAL PLANS.pdf 3.35 MB
PDF icon 26index – revised 10-09-2020.pdf 57.88 KB
PDF icon 260100 – general provisions – electrical – revised 10-09-2020.pdf 99.96 KB
PDF icon 260111 – basic electrical requirements – revised 10-09-2020.pdf 61.17 KB
PDF icon 260114 – electrical demolition – revised 10-09-2020.pdf 73.4 KB
PDF icon 260235 – electrical testing – revised 10-09-2020.pdf 65.12 KB
PDF icon 260513 – medium voltage conductors – added 10-09-2020.pdf 85.7 KB
PDF icon 260519 – low voltage electrical power conductors and cables – revised 10-09-2020.pdf 76.01 KB
PDF icon 260526 – grounding and bonding for electrical systems.pdf 63.59 KB
PDF icon 260543 – underground ducts and raceways for electrical systems – revised 10-09-2020.pdf 97.89 KB
PDF icon 260553 – identification for electrical systems – revised 10-09-2020.pdf 80.22 KB
PDF icon 265600 – exterior lighting – revised 10-09-2020.pdf 85.46 KB
PDF icon Addendum 5 – East Village Infrastructure – 10-27-20.pdf 3.77 MB