Archibus Notifications
POWER INTERRUPTION AT STUDENT ACTIVITY CENTER AND RUP 1
What’s Going On:
There will be a power interruption to RUP 1 and the Student Activity Center.
When:
Saturday, June 20, 2026 7:00 AM to Saturday, June 20, 2026 9:00 AM
What to Expect:
– Electrical power will be briefly interrupted.
– The emergency generators serving these two buildings will activate and provide back-up power to RUP 1 and to the Student Activity Center.
Affected Buildings:
* Barnhardt Student Activity Center
* Regional Utility Plant 1
Why:
This will improve the safety and reliability of medium voltage feeds to RUP 1 and the Student Activity Center.
For any questions or concerns please contact sgant1@uncc.edu (Stanley Gant) at 7046875597
STAR QUAD SOFT WASHING OF PRECAST, WALLS, AND PAVERS
What’s Going On:
Cleaning of walls, precast, and pavers as needed at Star Quad.
When:
Thursday, June 18, 2026 6:30 AM to Thursday, June 18, 2026 3:00 PM
What to Expect:
– Soft wash & pressure washing equipment will be in use.
– May be a slight bleach smell.
– Please avoid these working areas during this time.
Affected Buildings:
* Atkins
* Cone University Center
* Barnhardt Student Activity Center
* South Library Lane
Why:
To clean and maintain precast, walls, and pavers.
For any questions or concerns please contact jcanapin@uncc.edu (Jon Canapino) at 7046870591
MEBANE/WOODWARD LOADING DOCK CLOSURE
What’s Going On:
The loading dock at Mebane/Woodward will be closed for crane access.
When:
Friday, June 19, 2026 5:00 AM to Friday, June 19, 2026
What to Expect:
– Crane will be on site.
– Material will be loaded to the roof.
– Access to the loading dock will be blocked while the crane is in place.
Affected Buildings:
* Mebane Hall
* Woodward Hall
* College of Health and Human Services
Why:
– Forecasted weather on 6/15 pushed the crane to 6/19.
– To install a crane for the Mebane Roof project.
For any questions or concerns please contact pajones@uncc.edu (Patrick Jones) at 7046870524
EAST DECK 2 CLOSURE – POSTPONED – East Deck 2
What’s Going On:
East Deck 2 closure postponed, new date TBD.
When:
Wednesday, June 17, 2026 to Wednesday, June 17, 2026
What to Expect:
East Deck 2 closure postponed, new date TBD.
Why:
Closure for pressure washing postponed due to equipment failure.
For any questions or concerns please contact lmharri2@uncc.edu (Lindsey Harris) at 7046870161
LANE CLOSURE OF LIBRARY LANE AT HONEYWELL INNOVATION HUB
What’s Going On:
Partial road closure on Library Lane between Honeywell Innovation Hub and Cameron Hall.
When:
Wednesday, June 17, 2026 8:00 PM to Wednesday, June 17, 2026 11:59 PM
What to Expect:
– Test holes confirming the location and depth of fiber optic duct banks will be dug along Library Lane.
– The holes will be repaired immediately thereafter.
– Expect construction crews in the roadway and hydro excavation trucks.
– One lane will remain open at all times and two way traffic will be maintained via flaggers.
Affected Buildings:
* Honeywell Innovation Hub
* Cameron Hall
* Library Lane
Why:
To enable the installation of a temporary/shoring wall for the loading dock of the new Honeywell Innovation Hub (Burson Renovation and Expansion).
For any questions or concerns please contact agergel1@uncc.edu (Attila Gergely) at 7045781510
UNION DECK ROTATING CLOSURES – Union Deck
What’s Going On:
Rotating closures of parking areas in Union Deck for pressure washing.
When:
Thursday, June 18, 2026 9:00 PM to Tuesday, June 23, 2026 9:00 AM
What to Expect:
June 19-20: Union Deck Upper closed; all parking in Union Deck lower. Enter via north entrance on Union Deck Lane.
June 21-22: Union Deck Lower closed; all parking in Union Deck upper. Enter via south entrance on Student Union Lane.
Why:
Periodic cleaning to maintain appearance and condition of parking facility.
For any questions or concerns please contact lmharri2@uncc.edu (Lindsey Harris) at 7046870161
PARKING LOT 13 CLOSURE (HAWTHORN)
What’s Going On:
Parking lot repairs and maintenance at Hawthorn’s parking lot – Lot 13.
When:
Monday, June 15, 2026 7:00 AM to Wednesday, June 17, 2026 5:00 PM
What to Expect:
– Lot 13 will be closed starting Monday, June 15th.
– Area will be blocked off.
– The work should be finished by the end of day on Wednesday, June 17th (weather permitting).
Affected Buildings:
* Hawthorn
* Lot 13
Why:
To repair and maintain the surface of Parking Lot 13
For any questions or concerns please contact sgant1@uncc.edu (Stanley Gant) at 7046875597
UREC & POPP MARTIN STUDENT UNION SIDEWALK CLOSURE
What’s Going On:
The sidewalk between the Popp Martin Student Union and UREC will be closed for construction (including the grassy area and 2 ADA parking spaces adjacent to this area).
When:
Monday, June 15, 2026 7:00 AM to Friday, July 31, 2026 5:00 PM
What to Expect:
– The area will be blocked off with a construction fence and impassable.
– Signage will be posted inside and outside to help guide patrons.
Affected Buildings:
* Popp Martin Student Union
* University Recreation Center
Why:
To improve ADA access and widen this sidewalk.
For any questions or concerns please contact afelock@uncc.edu (Amanda Felock) at 7046870534
PARKING LOT CRI 1A AND PARKING LOT CRI 2A CLOSURES
What’s Going On:
Resurfacing and sidewalk improvements both ADA Parking Lots CRI 1A and CRI 2A.
When:
Wednesday, June 17, 2026 7:00 AM to Saturday, July 18, 2026 8:00 AM
What to Expect:
– Area will be blocked off with cones and barricades.
– Large equipment on site.
– They are scheduled to be re-opened by July 18th, 2026
Affected Buildings:
* Lot CRI 1A
* Lot CRI 2A
Why:
To resurface these parking areas and to improve sidewalks in the parking areas to meet current ADA standards.
For any questions or concerns please contact sgant1@uncc.edu (Stanley Gant) at 7046875597