PLANNED POWER OUTAGE TO POPP MARTIN STUDENT UNION – Popp Martin Student Union
What’s Going On:
This will be rescheduled to a later date.
All power will be shut down to the building.
When:
Tuesday, June 23, 2026 to Tuesday, June 23, 2026
What to Expect:
– There will be no power in the building except for those circuits that are backed by the generator.
– All life safety equipment will remain fully functional.
Why:
To test the generator and ATS backup systems for operational reliability.
For any questions or concerns please contact stallen4@uncc.edu (Samuel Tallent) at 7046874126
NEW CROSSWALK SPEED TABLE INSTALLATION CAMERON BLVD.
What’s Going On:
Had to be delayed due to the weather.
Speed tables will be installed on either side of the new crosswalk between Lots 6 & 6A.
When:
Wednesday, June 24, 2026 6:30 AM to Thursday, June 25, 2026 12:00 PM
What to Expect:
– The Cameron Blvd. entrance from John Kirk Dr. will be closed.
– A portion of Cameron Blvd. will be closed from the John Kirk entrance to the entrance of Lot 6A (see map).
– Barricades and signs will be in place.
Tuesday, June 23rd – 6:30 am until noon.
Wednesday, June 24th – 6:30 am until noon.
Affected Buildings:
* Campus
* Lot 6
* Lot 6A
Why:
Installation of speed tables.
For any questions or concerns please contact jcanapin@uncc.edu (Jon Canapino) at 7046870591
ATKINS LIBRARY CLOSURE & ELECTRICAL INTERRUPTIONS – Atkins
What’s Going On:
The Atkins Library will be closed and inaccessible to all faculty, staff, and students.
When:
Thursday, June 25, 2026 5:00 AM to Sunday, June 28, 2026 9:00 PM
What to Expect:
– Several large-scale power outages in the building lasting up to 24 hours each, including outages to the life safety systems in the building.
Why:
To facilitate major electrical upgrade/modernization work at the Atkins mechanical yard and generator.
For any questions or concerns please contact agergel1@uncc.edu (Attila Gergely) at 7045781510
SOFT WASHING OF PRECAST, WALLS, AND PAVERS
What’s Going On:
Cleaning precast, walls & pavers along Craver Rd on the south side between CHHS and the Auxiliary Services Building.
When:
Wednesday, June 24, 2026 6:30 AM to Wednesday, June 24, 2026 3:00 PM
What to Expect:
– Could impact the sidewalks, but will mainly be focused on the knee walls and pathways.
– Soft wash & pressure washing equipment will be in use.
– May be a slight bleach smell.
– Please avoid these working areas during this time.
Affected Buildings:
* Auxiliary Services Building
* Cameron Hall
* College of Health and Human Services
* Craver Road
Why:
To clean and maintain precast, walls, and pavers.
For any questions or concerns please contact jcanapin@uncc.edu (Jon Canapino) at 7046870591
CHHS POWER OUTAGE – College of Health and Human Services
What’s Going On:
Power to the College of Health and Human Services building will be shut off temporarily.
When:
Friday, June 26, 2026 6:00 AM to Friday, June 26, 2026 8:00 AM
What to Expect:
– Emergency systems will operate via the generator during this time period
– All other power in the building will be offline.
Why:
To add an upsized temporary power feed from a shared transformer for the construction of the Honeywell Innovation Hub.
For any questions or concerns please contact agergel1@uncc.edu (Attila Gergely) at 7045781510
CONE CENTER LOADING DOCK – Cone University Center
What’s Going On:
Cone Center Loading Dock will be inaccessible and blocked off to traffic.
When:
Tuesday, June 23, 2026 8:00 AM to Tuesday, June 23, 2026 5:00 AM
What to Expect:
Loading dock and loading dock entryway will be marked and blocked off to deter incoming traffic.
Why:
Cone structural damage and water intrusion assessment.
For any questions or concerns please contact llanier@uncc.edu (Lisa Sain) at 7046870527
LOADING DOCK CLOSURE AT FRIDAY – Friday
What’s Going On:
The loading dock at the Friday building is being closed off.
When:
Monday, June 22, 2026 7:00 AM to Friday, July 17, 2026 5:00 PM
What to Expect:
– Deliveries to the building can be made via the adjacent concrete driveway between Fretwell and Friday.
– Construction equipment, materials, and personnel in the area.
– Dumpster service has been suspended during this time period and waste from Friday is being sent to nearby dumpsters.
Why:
To rebuild the two damaged retaining walls at the Friday loading dock, and provide protection against future impacts from delivery vehicles and dumpsters.
For any questions or concerns please contact agergel1@uncc.edu (Attila Gergely) at 7045781510
UPDATE – PARKING LOT 13 CLOSURE (HAWTHORN)
What’s Going On:
Parking lot repairs and maintenance at Hawthorn’s parking lot – Lot 13.
When:
Monday, June 22, 2026 7:00 AM to Wednesday, June 24, 2026 5:00 PM
What to Expect:
– Lot 13’s closure time has been extended.
– The work should be finished by the end of day on Wednesday, June 24th (weather permitting).
– The lot will continue to be shut down.
Affected Buildings:
* Hawthorn
* Lot 13
Why:
To repair and maintain the surface of Parking Lot 13.
For any questions or concerns please contact sgant1@uncc.edu (Stanley Gant) at 7046875597
SIDEWALK CLOSURE AND DEMO WORK AT KENNEDY SOUTH – Kennedy
What’s Going On:
The sidewalk and stair at the south side of Kennedy will be closed off for all non-emergency traffic to remove the Kennedy canopy as part of the ongoing work to replace the stairs.
When:
Monday, June 29, 2026 7:00 AM to Friday, July 17, 2026 5:00 PM
What to Expect:
– Heavy construction equipment including a crane, demo machinery, and dumpsters.
– A protected emergency egress route will be in place during this time for one set of egress doors as the contractor works.
– This entrance has been closed since November 2025 to all traffic except emergencies due to the failure of the steps which was associated with the canopy.
Why:
To remove the precast concrete canopy at the south side of Kennedy.
For any questions or concerns please contact agergel1@uncc.edu (Attila Gergely) at 7045781510
UREC & POPP MARTIN STUDENT UNION SIDEWALK CLOSURE
What’s Going On:
The sidewalk between the Popp Martin Student Union and UREC will be closed for construction (including the grassy area and 2 ADA parking spaces adjacent to this area).
When:
Monday, June 15, 2026 7:00 AM to Friday, July 31, 2026 5:00 PM
What to Expect:
– The area will be blocked off with a construction fence and impassable.
– Signage will be posted inside and outside to help guide patrons.
Affected Buildings:
* Popp Martin Student Union
* University Recreation Center
Why:
To improve ADA access and widen this sidewalk.
For any questions or concerns please contact afelock@uncc.edu (Amanda Felock) at 7046870534