Archibus Notifications
CENTRAL DECK SIGNAGE INSTALLATION – Central Deck (West Deck)
What’s Going On:
A vendor will be installing new exterior signage on Central Deck.
When:
Wednesday, November 25, 2026 7:00 AM to Wednesday, November 25, 2026 5:00 PM
What to Expect:
The signage vendor will be working in the area using a bucket truck to install the new signage. Please use caution when traveling near the work area.
Why:
This work is being completed to replace the temporary parking deck signs with permanent signage.
For any questions or concerns please contact ltuboran@uncc.edu (Lily Tu-Boranian) at 7046874393
LOT 20 CLOSURE – Lot 20
What’s Going On:
Maintenance work will be performed on Parking Lot 20.
When:
Friday, November 20, 2026 10:00 PM to Friday, November 27, 2026 5:00 PM
What to Expect:
Vehicle access to Parking Lot 20 will be restricted from November 20 through November 27, weather permitting. During this period, vehicles will not be permitted to access the parking lot while maintenance work is underway.
Why:
This work is necessary to seal-coat, crack-seal, and re-stripe Parking Lot 20 to maintain the lot’s condition and improve its overall appearance.
For any questions or concerns please contact afernan7@uncc.edu (Alexander Fernandez) at 7046878139
RECEPTACLE PAD CONSTRUCTION
What’s Going On:
Minor construction work involving the installation of paver pads will take place this week at the following campus locations:
– Cameron East Entrance
– Miltimore Hall Access Drive
– University Road Across from Cone Deck
– Phillips Drive at Epic Crosswalk
– Lynch Hall near Student Union Bridge
– Student Center Health
When:
Tuesday, November 24, 2026 7:00 AM to Wednesday, November 25, 2026 4:00 PM
What to Expect:
During the construction period, individuals can expect to see construction crews and equipment working in the designated areas. Work areas will be temporarily blocked off using traffic cones and caution tape for safety.
Affected Buildings:
* Cameron Hall
* Student Health Center
* EPIC Building
* Lynch Hall
* Miltimore Hall
* University Road
Why:
This work is being completed to create designated concrete paver pads for trash receptacles throughout campus.
For any questions or concerns please contact gmellett@uncc.edu (Gregory Mellett) at 7046878115
UNIVERSITY CITY BLVD LANE CLOSURES AND CROSSWALK EXPANSION – Campus
What’s Going On:
The City of Charlotte is installing a crosswalk behind the Gage Admissions Building across University City Blvd (HWY 49). This crosswalk will connect to the sidewalk near the main campus entrance. Additionally, the city is implementing crosswalk improvements on University City Blvd (HWY 49) at Suther Rd.
When:
Monday, November 9, 2026 to Saturday, May 1, 2027
What to Expect:
Please be aware that the schedule is weather-dependent and may change due to rain, the threat of rain, or low temperatures. The City of Charlotte, which is conducting the work, will communicate any schedule changes as promptly as possible.
Construction equipment and personnel on site
Lane closures between 9:00 AM and 4:00 PM
Potential traffic delays
Why:
To keep the university informed of potential traffic delays and construction around the main entrance of campus.
For any questions or concerns please contact pajones@uncc.edu (Patrick Jones) at 7046870524
MCENIRY, SMITH, PROSPECTOR AND FRIDAY REDUCED COOLING
What’s Going On:
McEniry, Smith, Prospector, and Friday will experience reduced cooling.
When:
Thursday, September 3, 2026 8:00 AM to Tuesday, December 1, 2026 5:00 PM
What to Expect:
During the notification period, occupants should expect warmer-than-normal temperatures in the buildings.
Affected Buildings:
* Smith
* McEniry
* Prospector
* Friday
Why:
A temporary chiller is in use while the permanent chiller is being repaired.
For any questions or concerns please contact dschenk1@uncc.edu (Daniel Schenk) at 7046870533
SIDEWALK AND STAIR CLOSURE AT KENNEDY SOUTH – Kennedy
What’s Going On:
The sidewalk and stair at the south side of Kennedy will be closed off via fencing and construction barricading.
When:
Tuesday, October 13, 2026 8:00 AM to Friday, January 29, 2027 5:00 PM
What to Expect:
– Heavy construction equipment including a crane, concrete trucks, dumpsters, etc.
– Temporary emergency egress routes WILL be provided and indicated via signage – the emergency egress route will vary depending on the phase of construction between usage of portions of the stairs, and usage of a temporary emergency exit ramp that will circumvent the stairs entirely.
Why:
This work is part of the ongoing project to replace the stairs, which have reached the end of their useful service life.
For any questions or concerns please contact agergel1@uncc.edu (Attila Gergely) at 7045781510
FRIDAY BUILDING CONSTRUCTION FENCING – Friday
What’s Going On:
Construction fencing will be in place between Friday and Fretwell.
When:
Monday, July 6, 2026 8:00 AM to Tuesday, December 1, 2026 5:00 AM
What to Expect:
Walkway between Friday and Fretwell will be narrowed to allow for construction fencing, but will still allow pedestrian flow through the area.
Why:
Construction fencing enclosure for dumpster and lay-down area for the Friday Classrooms Renovation project.
For any questions or concerns please contact llanier@uncc.edu (Lisa Sain) at 7046870527
SIDEWALK CLOSURE – SANITARY SEWER CONSTRUCTION
What’s Going On:
The east sidewalk on Cameron Blvd, near the intersection of Cameron Blvd and Johnson Alumni Way, will be closed for construction.
When:
Friday, June 12, 2026 to Sunday, February 28, 2027
What to Expect:
– Barricades and signage in place.
Affected Buildings:
* Campus
* Cameron Boulevard
Why:
To create an access into the woods behind Laurel Hall for the Sanitary Sewer project.
For any questions or concerns please contact pajones@uncc.edu (Patrick Jones) at 7046870524
LOT 15 AND SIDEWALK CLOSURE
What’s Going On:
Lot 15, CHHS Lane, and all public access to the Honeywell Innovation Hub (Burson Hall) will be closed off. Sidewalks along Craver Road and Library Lane will also be closed off.
When:
Friday, April 10, 2026 5:00 PM to Tuesday, November 30, 2027 11:59 PM
What to Expect:
Reminder about LOT 15 Closure.
Barricading with signage indicating closure & rerouting pedestrian and ADA traffic.
Affected Buildings:
* Honeywell Innovation Hub
* Lot 15
* Chhs Lane
Why:
Construction of the Burson Renovation and Expansion project (Honeywell Innovation Hub).
For any questions or concerns please contact agergel1@uncc.edu (Attila Gergely) at 7045781510
LOT 11 PARKING SPACE CLOSURES – Lot 11
What’s Going On:
Parking spaces will be blocked off during construction of the Loy Witherspoon Center for Meditation and Reflection.
When:
Friday, May 8, 2026 8:00 AM to Friday, January 29, 2027 5:00 PM
What to Expect:
6 parking spaces will be permanently closed and captured for the construction of the new Loy Witherspoon Center, and section of spaces adjacent to the construction site entrance will be temporarily closed for a portion of the construction project.
Why:
For the new construction of the Loy Witherspoon Center for Meditation and Reflection.
For any questions or concerns please contact llanier@uncc.edu (Lisa Sain) at 7046870527