Active

Robinson Humidity and Boiler Replacement

Tags: Designer Solicitations;

Submittals are due by 2:00 p.m., April 30, 2026.

This project will perform work on existing HVAC systems in Robinson Hall to control humidity in critical spaces. The majority of this building’s systems are original and have surpassed their expected life cycle. Airflow monitoring to be added to buildings AHUs throughout in addition, this project will replace end of life boilers, including one currently leaking. This will improve the building’s ability to provide heating to the building. It will also include a full TAB of the building.

Dubois Center Energy Efficiency Controls Upgrade

Tags: Designer Solicitations;

Submittals are due by 2:00pm, April 29, 2026.

This project will include the replacement of the Dubois Center HVAC Controls. The majority of the building’s systems are original and have surpassed their expected life cycle. The project will include energy efficient controls strategies to improve the overall energy efficiency of the HVAC system as well as people counters that will control building ventilation. Pre functional testing of HVAC and control systems in design for system deficiencies and fully rebalance the system.

Grigg Hall – HVAC Controls Replacement

Tags: Construction Bids;

*UPDATE** Bids are due by 2:00 p.m., April 28, 2026.

The scope of the project includes replacing mechanical control elements associated with existing pneumatically controlled systems, and control elements associated with spaces requiring critical air control in the Grigg building on the UNC Charlotte campus.

University Pond Enhancement Project

Tags: Designer Solicitations;

Submittals are due by 2:00 p.m., April 9, 2026.

The project is for the enhancement of the University’s Pond located at 8922 N Tryon St, Charlotte, NC. Part of the pond is also on the property of Atrium Health University City.

The design will be consistent with the University’s Design & Construction Manual, found at:   http://facilities.uncc.edu/DCManual

Sanitary Sewer Repair and Replacement (South Village)

Tags: Construction Bids;

**UPDATE** Bids are due by 3:30 p.m., April 16, 2026.

The project includes the construction of the rehabilitation and replacement of sanitary and storm sewer infrastructure serving the South Village area of the University of North Carolina at Charlotte campus. Major elements of work include installation of new gravity sanitary sewer, replacement of manholes and drainage structures, cleaning and CCTV inspection of existing sewers, cured-in-place pipe (CIPP) lining, manhole rehabilitation, and associated surface and site restoration. The project also includes a bid alternate to replace the Scott Hall access drive.

Community Outreach Event

Categories: Active, General News

Posted on January 21, 2025 Click Link to Register for Event: tinyurl.com/PDC-Outreach

Construction Outreach Event

Categories: Active, General News

Posted on January 21, 2025 Click Link to Register for Event: tinyurl.com/PDC-Outreach