SKYLIGHT REPLACEMENT AT CATO HALL – Cato Hall

What’s Going On:
There will be a lift positioned at the east side of Cato Hall.

When:
Friday, October 16, 2026 8:00 AM to Friday, October 16, 2026 3:30 PM

What to Expect:
– A scissor lift will be positioned near the main entrance facing the East Deck.
– Contractors will be working from the lift to replace the broken glass in the skylight.
– The area will be blocked off with cones and caution tape.
– A technician will remain on the ground to direct pedestrians safely around the work area as needed.
– We do not anticipate blocking any building entrances or exits during the repairs.

Why:
This work is being done to repair a broken skylight.
For any questions or concerns please contact jhmckinn@uncc.edu (John McKinney) at 7046870338