DPR has been selected as the CM at Risk for the University of North Carolina at Charlotte Burson
Renovation and Expansion. The project includes project-based engineering labs, active learning
classrooms, collaboration space and specialized data visualization and simulation labs to support growing
engineering and computing programs. Computational research space, academic and administrative office
space will be included in the building. Mechanical, electrical, plumbing and fire-protection systems will be
upgraded. The College of Engineering and the College of Computing and Informatics will be the primary
departments located in the building.
Bid Packages to Prequalify:
02A Deconstruction
03A Cast-In-Place Concrete
O3J Polished Concrete
04A Masonry
05A Structural Steel Framing
06A Architectural Woodwork
06D Waterproofing
07B Roofing
07C Fireproofing
07D Metal Panels
08A Doors, frames & hardware
08C Glass & Glazing
09A Drywall
09B Hard Tile
09C Acoustical Ceilings
09D Flooring
09H Painting & WC
10A Specialties
10I Signage
11A Dock Equipment
11C Lab Casework & Equipment
12A Window Treatments
14A Elevators
22A Plumbing
23A Pneumatic Tube Systems
21A Fire Suppression
22A HVAC
23B Test & Balance
26A Electrical
27A Data & Communications
28A Fire Alarm
31C Earthwork
32K Landscaping & Hardscapes
01E Final Cleaning
Completed Pre-Qualification packages should be submitted by mail to DPR:
DPR Construction
200 Southside Dr.
Charlotte, NC 28217
Or by email to: Katarina Hastings
Katarinah@dpr.com
CMR 1st tier pre-qualifications- Part A
CMR 1st tier pre-qualifications- Part B
Pre-qualifications Matrix- Part B- Exhibit 2