Not Active

Hawthorn Hall Renovation

Categories: Advertisements Tags: Not Active

Bids are due by 10 a.m., March 26, 2025. Project Description:The University of North Carolina Charlotte is undertaking a partial renovation of Hawthorn Residence Hall, focusing mainly on replacingthe mechanical, plumbing, and electrical systems that date back to the original construction in 1981. Additionally, the project willreconfigure the staff apartment and enlarge the bathrooms in […]

Parking Lot 26 Renewal

Categories: Advertisements Tags: Not Active

Proposals are due by 2 p.m., March 26, 2025. Project Description:The project involves the full depth asphalt replacement and replacement of damaged curb andgutter of Parking Lot 26 parking lot including restriping.Some of the important design elements will be:● Site design consistent with established style of campus, university master plan, anduniversity design manual.● Simplicity of […]

Construction Outreach Event – SOLD OUT

Categories: Advertisements Tags: Not Active

To register click here: SOLD OUT

Elevator Upgrades – Fretwell

Categories: Advertisements Tags: Not Active

Submittals are due by 2:00 p.m., May 8, 2025. Project Description:The proposed project is for the design and construction administration of elevator modernization inFretwell building located on the UNC Charlotte campus. The Fretwell building, constructed in 1996, isan academic building with 160,345 gross square feet. The building has three elevators. This project willupgrade the existing […]

Burson Exterior Bridge Replacement

Categories: Advertisements Tags: Not Active

Submittals are due by 10:00 a.m., March 4, 2025. Project Description:The Burson Hall was built in 1983 on the UNC Charlotte campus with an elevated plaza andpedestrian bridge at the Southeast corner, constructed with structural steel framing supporting asandwich slab. An assessment of the condition of the pedestrian bridge and plaza revealedextensive deterioration of the […]

Building Envelope Repairs – Multiple Buildings

Categories: Advertisements Tags: Not Active

Submittals are due by 10:00 a.m., March 4, 2025. Project Description:This project will replace caulking at windows and control joints, repoint brick, and seal the masonry at several buildings on campus. RFQ Submittals shall be mailed or hand delivered to:The University of North Carolina at CharlotteAttn: La’Keya HewlinFacilities Management-Project Management9151 Cameron Blvd. 2nd FloorCharlotte NC […]

Construction Outreach Event

Categories: Advertisements Tags: Not Active

To register click here: tinyurl.com/PDC-Outreach

Cameron Roof Replacement

Categories: Advertisements Tags: Not Active

Bids are due by 2:00 p.m., February 18, 2025. An open pre-bid meeting will be held for all interested bidders on February 4, 2025, at 2:00 PM in McEniry Building, Room 105 located at 9215 Mary Alexander Rd., Charlotte NC 28223. (campus map – http://facilities.charlotte.edu/maps) Project Description:This project consists of the replacement of the existing roofing system(s) at […]

Rebid-Hawthorn Hall Renovation

Categories: Advertisements Tags: Not Active

Bids are due by 2 p.m. on February 18, 2025. Please refer to the locations for drop-off listed below. An open Pre-Bid and MWSBE Outreach meeting will be held on-site and virtual for ALL interested firms on January 16, 2025, at 2:00PM, Cone University Center, located at 9025 University Rd, Room 111, Charlotte, NC 28223. […]

Parking Lot 5 Pavement Renewal

Categories: Advertisements Tags: Not Active

Submittals are due by 10:00 a.m., February 11, 2025. An open pre-bid meeting will be held for all interested bidders on  January 21, 2025 at the FacilitiesManagement, Police and Public Safety, Building 55, Room 119, 9151 Cameron Blvd., Charlotte, NC28223 at 11:00 am. (campus map – http://facilities.charlotte.edu/maps) Project Description:Replacement of existing bituminous concrete pavement via Full Depth Replacement process, […]