Prospector Dining Mid-Level Refresh
Submittals are due July 22, 2025, at 2:00 p.m.
A Pre-Proposal Meeting will be held at 9:00 a.m., on July 9, 2025 in Smith Building (#12
on the campus map – http://facilities.charlotte.edu/maps), Room 201. Visitor parking is available for
payment in East Deck 1 or Union Deck (levels 4-6). A tour of the building will take place
immediately following the meeting.
Location:
The University of North Carolina at Charlotte
319 Library Ln
Smith Room 201
Charlotte, NC 28223
PROJECT DESCRIPTION:
The project will be a comprehensive renovation of dining facilities in the 100 level of the Prospector
building. The project will include interior demolition and new interior construction of approximately
8,592 square feet. The project will refresh the space required by Chick-fil-A brand. It will include
exploring expansion of the kitchen and increasing seating capacity to accommodate an increase in
customers. The project will include new flooring, lighting and seating options in the existing seating
area. Replacement of food service equipment, replacement of mechanical, electrical distribution
and exhaust systems will also be included.
All other operations in the Prospector building will remain in operation during the construction. The
contractor’s access to the building, lay-down areas and space for storing materials is a critical
consideration in the planning of the project.
Prospector is 44,000 square feet, was constructed in 1980 and is located at 9112 North Library
Lane.
RFP
Submittals shall be addressed to:
La’Keya Hewlin
The University of North Carolina at Charlotte
Facilities Management-Project Management
9151 Cameron Blvd.
Charlotte NC 28223-0001