Advertisements
2012 Architectural Engineering Designer Symposium Presentation and Attendee List
Symposium Attendees List Symposium Presentation
Academic Complex Commissioning
The University of North Carolina at Charlotte will be accepting submittals for Commissioning until 2:00 PM, October 21, 2014. Attachment Size Commissioning 8FQ08 73.35 KB
Atkins Library Study Request for Proposal
The University will be accepting Designer submittals for the Atkins Library Study until 2:00 PM, Thursday, March 6, 2014. A mandatory pre-proposal meeting will be held at 1:30 PM. on Monday, February 24, 2014 in Cone Center Room 112. UPDATE* 2/21/2014 – Previous Atkins Study. UPDATE* 2/24/2014 – Pre-Proposal Meeting Attendees UPDATE*2/25/2014 – Atkins Study […]

Belk Gym Renovation – Advertisement for Re-Bids
Bids will be received for the Belk Gym Renovation project by New Atlantic/WC Construction up to 10:00 AM, Friday, May 30, 2014 at which time the bids will be opened in room 210 of the Cone University Center at 10:00 AM. Sealed proposals may also be submitted via hand delivery or courier delivery no later […]
Residence Phase XIV Early Site Package Subcontractor Prequalification
Rodgers will be accepting 1st tier subcontractor prequalification forms for only the following early site trade packages; 02A Sitework; 02H Site Electrical; 03C Complete Concrete Structures; 05A Steel Structures; 07B Waterproofing; and 14A Elevators, until 5:00 PM, Tuesday, December 2, 2014. Rodgers will be hosting a Project Information & Vendor Outreach Session Tuesday, November 18, […]
Campus Infrastructure Development–Roadway Improvements Contractor Prequalification
The University of North Carolina at Charlotte will be accepting submittals until 2:00 PM on Thursday, December 4, 2014. Attachment Size Contractor Prequalification Ad Cover Sheet (2014).docx 135.8 KB State of NC Prequalification Policy – November 2014.pdf 198.05 KB Prime Contractor Prequal Form.docx 48.31 KB
Campus Infrastructure Development – Phase 2 Campus Wi/Fi Contractor Pre-Qualification
The University of North Carolina at Charlotte will be accepting submittals until 2:00 PM on Thursday, November 20, 2014. Attachment Size 20141015 General Contractor Prequal Cover Sheet.docx 136 KB 20141015 General Contractor Prequalification.docx 61.4 KB
Outdoor Events Shelter – Update
The due date for Designer submittals has been extended until 2:00 PM Monday, December 1, 2014. Attachment Size Outdoor Events Shelter Designer RFP.docx 34.65 KB
Outdoor Events Shelter – Construction Manager at Risk – Update #2
The University of North Carolina at Charlotte will be accepting Construction Manager at Risk proposals until 2:00 PM Thursday, December 18, 2014. A Pre-proposal meeting was held December 9, 2014. Attachment Size CM@Risk pre-qual short form-1.doc 66.5 KB Outdoor Events Shelter – PP Presentation.pdf 1.45 MB Pre-proposal Mtg Sign-in.pdf 53.13 KB