Advertisements
Residence Phase XIV Early Site Package Subcontractor Prequalification
Rodgers will be accepting 1st tier subcontractor prequalification forms for only the following early site trade packages; 02A Sitework; 02H Site Electrical; 03C Complete Concrete Structures; 05A Steel Structures; 07B Waterproofing; and 14A Elevators, until 5:00 PM, Tuesday, December 2, 2014. Rodgers will be hosting a Project Information & Vendor Outreach Session Tuesday, November 18, […]
Campus Infrastructure Development–Roadway Improvements Contractor Prequalification
The University of North Carolina at Charlotte will be accepting submittals until 2:00 PM on Thursday, December 4, 2014. Attachment Size Contractor Prequalification Ad Cover Sheet (2014).docx 135.8 KB State of NC Prequalification Policy – November 2014.pdf 198.05 KB Prime Contractor Prequal Form.docx 48.31 KB
Campus Infrastructure Development – Phase 2 Campus Wi/Fi Contractor Pre-Qualification
The University of North Carolina at Charlotte will be accepting submittals until 2:00 PM on Thursday, November 20, 2014. Attachment Size 20141015 General Contractor Prequal Cover Sheet.docx 136 KB 20141015 General Contractor Prequalification.docx 61.4 KB
Outdoor Events Shelter – Update
The due date for Designer submittals has been extended until 2:00 PM Monday, December 1, 2014. Attachment Size Outdoor Events Shelter Designer RFP.docx 34.65 KB
Outdoor Events Shelter – Construction Manager at Risk – Update #2
The University of North Carolina at Charlotte will be accepting Construction Manager at Risk proposals until 2:00 PM Thursday, December 18, 2014. A Pre-proposal meeting was held December 9, 2014. Attachment Size CM@Risk pre-qual short form-1.doc 66.5 KB Outdoor Events Shelter – PP Presentation.pdf 1.45 MB Pre-proposal Mtg Sign-in.pdf 53.13 KB
Campus Infrastructure Development Roadway Improvements – Notice To Bidders
The University of North Carolina at Charlotte will receive sealed bids from only prequalified contractors until 2:00 p.m. Tuesday, January 27, 2015. A mandatory Pre-bid meeting will be held Tuesday, January 13, 2015 at 2:00 p.m. in Room 112 of the Cone University Center. *UPDATE* January 14, 2015 – Prebid Meeting Sign-In Sheet now posted. […]
Construction Materials Testing and Special Inspections
The University of North Carolina at Charlotte will be accepting qualification submittals for Construction Materials Testing & Special Inspections until 2:00 p.m. Wednesday, January 28, 2015 for the following projects; Residence Hall Phase XIV and South Entrance Intersection Improvements. Attachment Size PhXIV-South Ent Construction Services RFQ.docx 36.75 KB
South Entrance Intersection Improvements – Contractor Prequalification
The University of North Carolina at Charlotte will be accepting prequalification submittals until 2:00 p.m. Wednesday, February 4, 2015. Attachment Size Contractor Prequalification Ad Cover Sheet (2015).docx 135.68 KB Prime Contractor Prequal Form.docx 50.08 KB State of NC Prequalification Policy – November 2014.pdf 198.06 KB