Kennedy Hall Roof Replacement
Submittals are due by 2:00 p.m., December 5, 2025.
Project Description:
The proposed project is for the design and construction of roof replacement for Kennedy Hall located on
the UNC Charlotte campus. The current roof is an PVC roof, approximately 16,200 square feet. Roof
replacement will be determined in design to be accomplished within budget. The screen wall will also
need to be replaced as part of this project.
All submittals should be delivered at the address below and placed in the brown bid/proposals drop box
located in the 1st floor lobby of FMPPS building 55.
The University of North Carolina at Charlotte
Facilities Management 1st Floor
9151 Cameron Blvd.
Charlotte NC 28223-0001