Atkins Tower ADA and Fire/Smoke Systems Upgrades- Prequalification of Subcontractors

**Update**Submittals are due by 5:00 p.m., Friday, November 10, 2023.

Project Description:
Phase 1 Scope:
The first phase of this project includes 2,425 sqft of interior renovations at Atkins Library on the ground floor. A
portion of the ground floor of the library is being converted to house the archives which are currently located on
floors 9 & 10 to prepare for phase 2 work.
The anticipated schedule for construction of phase 1 is February 2024 to May 2024.
Phase 2 Scope:
The second and final phase of this project includes approximately 11,500 sqft of interior renovations required for
ADA and Fire/Smoke System upgrades. The existing elevator and portions of the shaft will be removed to
expand the footprint and install a larger elevator. Additional renovations for ADA compliance and upgrades to
the Fire/Smoke system will take place on floors 1 through 10. This phase also includes restroom renovations on
floors 5 through 10.
The anticipated schedule for construction of phase 1 is May 2024 to August 2025.

Submittals shall be addressed to:
Barton Malow Builders – Attention: Charles Littrell
2322 Dunavant St., Suite #100
Charlotte, NC 28203

Submittals can also be emailed to Charles.Littrell@bartonmalow.com & tim.murphy@bartonmalow.com

Attachment Size
PDF icon UPDATED Atkins Tower Pre-qualification Advertisement.pdf 111.26 KB
PDF icon UPDATED Atkins Prequalification – Part A.pdf 120.01 KB
PDF icon UPDATED Atkins Prequalification – Part B.pdf 86.87 KB
PDF icon Updated_Prequal_Matrix 204.55 KB