IT Infrastructure Upgrades (Storrs, Rowe & Reese) – Notice To Bidders
Shiel Sexton will be accepting sealed bids from Pre-qualified 1st Tier Subcontractors only for the following trade packages: 01A General Trades; 23A HVAC; 26A Electrical; and 27A Telecommunications, until 1:30 p.m. Thursday, April 30, May 14, Tuesday, June 2, 2020 Tuesday, June 16, Tuesday, June 23, 2020. Bid opening will be at 2:00 p.m. Note: Special instructions have been included in the Notice to Bidders due to the COVID-19 Crisis.
A non-mandatory Pre-Bid meeting was held at 2:00 p.m. Tuesday, April 14, 2020.
Addendum #1 posted to this site 04/16/2020
Addendum #2 posted to this site 04/22/2020
Addendum #3 posted to this site 04/29/2020
Addendum #4 posted to this site 05/08/2020
Addendum #5 posted to this site 05/13/2020
Addendum #6 posted to this site 06/01/2020
Attachment | Size |
---|---|
UNCC IT Infrastructure NTB_FINAL.pdf | 154.01 KB |
63.67 KB | |
864.6 KB | |
920.54 KB | |
111.2 KB | |
1.97 MB | |
110.48 KB | |
724.84 KB | |
530.94 KB |