Robinson Humidity and Boiler Replacement

Categories: Advertisements Tags: Active

Submittals are due by 2:00 p.m., April 30, 2026.

Project Description:

This project will perform work on existing HVAC systems in Robinson Hall to control humidity in critical spaces. The majority of this building’s systems are original and have surpassed their expected life cycle. Airflow monitoring to be added to buildings AHUs throughout in addition, this project will replace end of life boilers, including one currently leaking. This will improve the building’s ability to provide heating to the building. It will also include a full TAB of the building.
Manufacturer teardown/service of both chillers and vav box controller replacements.

RFQ

Mailed Submittals shall be addressed to:
The University of North Carolina at Charlotte
Facilities Management 1st floor
9151 Cameron Blvd.
Charlotte, NC 28223-0001
TEL: 704-687-0001

Hand delivered submittals:

All submittals being dropped off early shall be placed in the brown bid/proposal dropbox located in the 1st floor lobby of Facilities Management Building #55 located at:
The University of North Carolina at Charlotte
Facilities Management 1st Floor
9151 Cameron Blvd.
Charlotte NC 28223-0001