RUP-4 HVAC & Controls

Categories: Advertisements Tags: Active

**UPDATE** Submittals are due by 2:00 p.m., November 12, 2025.

Project Description:
Controls
All other electrical work necessary to complete the project.
Replace obsolete BAS controls with EcoStruxure graphic front-end (Schneider Preferred)
Replace sensors, flow meters. Original valves and actuators.
Mechanical
Replacement of the 300 Tons Chiller VFD.
Installation of upstream power conditioner/power quality units upstream of the chiller.
Installation of Water Side economizer for the plant.
Replace IT and Electrical Room RTU’s.
Replace all maintenance-prone primary and secondary chilled and hot water pumps.
Replace chemical controllers, pumps and probes, make up water meter and Blowdown water meter, make up water valve and actuators, Blowdown water valves and actuators.
Replace refrigerant monitoring systems.
Electrical
All other electrical work necessary to complete the project.

RFQ

Submittals shall be mailed or hand delivered to:
The University of North Carolina at Charlotte
Attn: La’Keya Hewlin
Facilities Management-Project Management
9151 Cameron Blvd. 2nd Floor
Charlotte NC 28223-0001