Electrical Grid Automation Phase 1
Submittals are due August 7, 2025, at 2:00 p.m.
PROJECT DESCRIPTION:
The existing campus medium voltage electrical distribution grid is manually operated and does
not allow Facility Management staff to monitor the grid in real time, collect data and control
the campus medium voltage system. Automating the electrical grid will allow remote control
capability, allow operators to open and close circuits without being exposed to electrical shock
hazards, and allow for faster response time when an electrical event requires a transfer of power
source. This project would replace our main campus substation switchgears (SUB-SW-1 and
SUB-SW-2) which provide power to 95% of our campus buildings.
RFP
Submittals shall be addressed to:
La’Keya Hewlin
The University of North Carolina at Charlotte
Facilities Management-Project Management
9151 Cameron Blvd.
Charlotte NC 28223-0001