IT Infrastructure Upgrades (Storrs, Rowe & Reese) – Notice To Bidders

Shiel Sexton will be accepting sealed bids from Pre-qualified 1st Tier Subcontractors only for the following trade packages: 01A General Trades; 23A HVAC; 26A Electrical; and 27A Telecommunications, until 1:30 p.m. Thursday, April 30, May 14, Tuesday, June 2, 2020 Tuesday, June 16, Tuesday, June 23, 2020. Bid opening will be at 2:00 p.m. Note: Special instructions have been included in the Notice to Bidders due to the COVID-19 Crisis.

A non-mandatory Pre-Bid meeting was held at 2:00 p.m. Tuesday, April 14, 2020.

Addendum #1 posted to this site 04/16/2020

Addendum #2 posted to this site 04/22/2020

Addendum #3 posted to this site 04/29/2020

Addendum #4 posted to this site 05/08/2020

Addendum #5 posted to this site 05/13/2020

Addendum #6 posted to this site 06/01/2020

Attachment Size
PDF icon UNCC IT Infrastructure NTB_FINAL.pdf 154.01 KB
PDF icon UNCC IT Upgrade Prequalified Subcontractos.pdf 63.67 KB
PDF icon UNCC IT Infrstructure Upgrade Addendum 1.pdf 864.6 KB
PDF icon UNCC IT Infrastructure Upgrade Addendum 2.pdf 920.54 KB
PDF icon Addendum 3 4.23.20.pdf 111.2 KB
PDF icon Addendum 4 5.7.20.pdf 1.97 MB
PDF icon Addendum 5.pdf 110.48 KB
PDF icon Addendum 6 Complete 6.1.20.pdf 724.84 KB
PDF icon Addendum 7.pdf 530.94 KB