Project Description:
1. New BACNET controllers for all HVAC equipment
2. Upgrade chilled water and hot water bridge and controls (including new VFD’s for
pumps)
3. Replace existing AHU-1 and AHU-2 with one single duct unit with fan wall (including
associated VFD’s)
4. Replace rooftop air handling units (current design intent is to replace them 1 for 1 with
similar unit size/capacity with new controls)
5. Replace 1st and 2nd floor dual duct VAVs with single duct VAVs with hot water reheat
6. Replace 3rd floor electric VAV’s with hot water VAV’s (to the extent construction budget
allows)
7. Provide hot water distribution to new VAV reheat coils
8. Upgrade fire alarm system to current code on 1st and 2nd floor
9. Provide architectural support scope for building code summary and minor patch/repair
work in support of scope of work outlined above.
Submittals shall be addressed to:
La’Keya Hewlin
The University of North Carolina at Charlotte
Planning, Design and Construction
2nd Floor-Facilities Management
9151 Cameron Blvd
Charlotte NC 28223-0001
Attachment | Size |
---|---|
Friday HVAC & Controls Commissioing RFQ.docx | 28.88 KB |