Campus Infrastructure Development Phase 2 – Campus Wi-Fi
The University of North Carolina at Charlotte will be accepting sealed bids from prequalified general contractors only until 2:00 p.m. Thursday, April 30, 2015.
A mandatory Pre-bid meeting will be held at 9:00 a.m. Wednesday, April 15, 2015.
Updates:
April 15, 2015 Mandatory Pre-bid Meeting Sign-in sheet has been posted.
April 21, 2015 Addendum #1 has been posted (distributed 4/17/2015)
April 23, 2015 Addendum #2 has been posted (2 parts).
| Attachment | Size | 
|---|---|
| 153.34 KB | |
| 422.21 KB | |
| 2.64 MB | |
| 12.93 MB | |
| 20.95 MB |