Bioinformatics Fourth Floor Build-Out – 1st Tier Subcontractor Prequalifications
Balfour Beatty will be accepting 1st Tier CMR Subcontractor prequalification forms Part A & B until 5:00 p.m. Monday, November 30, 2020 for the following trade packages; 01A Final Cleaning; 01B General Trades; 06A Millwork; 08A Doors/Frames & Hardware; 08B Glass & Glazing; 09A Drywall; 09B Acoustical Assemblies; 09C Hard Tile; 09C Flooring; 09E Resinous Flooring (Alternate); 09F Painting; 10A specialties; 10B Signage; 12A Window Treatments (Alternate); 12B Laboratory Casework; 14A Elevators; 21A Fire Protection; 22A Plumbing; 23A HVAC; 23B Test & Balance; 26A Electrical; and 27A Data-Telecommunications.
Attachment | Size |
---|---|
Prequalification Advertisement for FM website.pdf | 106.68 KB |
Part A CMR 1stTier Prequal – Annual Submittal 102620.docx | 31.62 KB |
33.35 KB |