Designer- King & Memorial Hall Envelope Repair & Roof Replacement

Submittals are due by 2:00 p.m., Thursday, October 12, 2023.

Do not transmit any submittal information via email. Please deliver one copy of the submittal, along with one electronic copy in pdf format USB.

Project Description:
The King building was built in 1966 and is approximately 29,000 square feet. An assessment of
the conditions will need to be conducted of the exterior walls and windows, in order to ascertain
the scope of repairs required. Memorial Hall was built in 1971 and is 12,400 square feet. An
assessment of the conditions will need to be conducted of the exterior walls, windows, and the
roof in order to ascertain the scope of repairs required. The renovations for the two buildings
should include and not limited to repairing or replacing flashings, sealants sealing existing brick,
and the roof of Memorial Hall.

Submittals shall be addressed to:
La’Keya Hewlin
The University of North Carolina at Charlotte
Planning, Design and Construction
2nd Floor-Facilities Management
9151 Cameron Blvd
Charlotte NC 28223-0001

Attachment Size
File RFQ King & Memorial Hall Envelope Repair & Roof Replacement (2).docx 28.27 KB