Designer RFQ – Sanitary Sewer Repair and Replacement (South Village)

Submittals are due by 2:00 p.m., July 23, 2024.
Do not transmit any submittal information via email. Please deliver one copy of the submittal, along with one electronic copy in pdf format USB.

Project Description:

The University initiated this project after experiencing two SSO’s (sanitary sewer overflows) within the
last few years in the same sewer collection basin. The proposed project is for the design, permitting,
and construction of sanitary sewer system R&R (repair and replacement) in the SOVI (South Village)
sewer collection basin. The scope of R&R was established as part of an engineering study completed in
early 2024 by Gavel & Dorn. The final engineering report will be shared with the firms that are
shortlisted. This work will be completed within budget.

Submittals shall be addressed to:
La’Keya Hewlin
The University of North Carolina at Charlotte
Facilities Management
2nd Floor-Project Management
9151 Cameron Blvd
Charlotte NC 28223-0001