Cameron Roof and Window Replacement

Submittals are due by 2:00 p.m., Thursday, February 9, 2023.
Do not transmit any submittal information via email. Please deliver one copy of the submittal, along with one electronic copy in pdf format USB

PROJECT DESCRIPTION:
The proposed project if for the design and construction of a roof and window replacement for Cameron
located on the UNC Charlotte campus. The proposed roof and window replacements are to improve
energy efficiency and reduce operation costs.
The 2 nd and 3 rd story roofs are proposed for replacement and are currently ballasted EPDM roofs and
approximately 35,000 SF in size total.
The existing fixed aluminum windows and curtain wall system need replacement and consist of
approximately 4,000 of glazing.

Any questions about the project should be directed via email to Jeanine Bachtel jbachtel@uncc.edu

Mailed Proposals:

Attn: Mrs. La’Keya Hewlin – Capital Projects

The University of North Carolina at Charlotte

Facilities Management – Capital Projects

9201 University City Boulevard

Charlotte, NC 28223-0001

Or

Hand Delivered:

Attn: Mrs. La’Keya Hewlin – Capital Projects

Facilities Management/ Police Building

2nd Floor – Capital Projects

9151 Cameron Boulevard

Charlotte, NC 28223

Attachment Size
PDF icon Cameron Roof and Window Replacement (1).pdf 213.46 KB