Science Building – Early Package 2 (RUP/Data Center/Site) – Rebid
Balfour Beatty Construction will be accepting sealed bids from Pre-qualified First Tier Subcontractors only for the following trade packages; 01B Final Cleaning; 08A Doors/Hardware; 09G Painting; 09F Epoxy Floor; and 26A Electrical, until 2:00 p.m. Tuesday, October 16, 2018. Re-bid will be held in Room 113, of the Cone University Center.
Attachment | Size |
---|---|
UNCC Science EP2 – Notice to Bid (Long form) final (4).pdf | 104.73 KB |