Scott Hall Renovation – Notice To Bidders
Balfour Beatty Construction will be accepting sealed bids until 2:30 p.m. Tuesday, January 24, 2017, from prequalified 1st Tier subcontractors only, for the following trade packages: BP-01B Final Cleaning; BP-02A Demolition/Abatement; BP-03A Concrete; BP-04A Masonry and Cast Stone; BP-05A Structural Steel & Misc. Metals; BP-06A Millwork; BP-07A Waterproofing and Caulking; BP-07B Roofing; BP-08A HM Doors and Frames, Wood Doors, Hardware; BP-08C Alum. Storefront, Alum. Windows; BP-09A Drywall, Metal Framing; BP-09B Acoustical Assemblies; BP 09C Combination Drywall and Acoustical Assemblies; BP 09D Hard Tile; BP-09E Flooring; BP 09F Combination Hard Tile and Flooring; BP-09G Paint; BP-10A Specialties; BP-10B Signage; BP-12B Window Treatments; BP-21A Fire Protection; BP-22A Plumbing; BP-23A HVAC; BP-23B Testing and Balance; BP-26A Electrical; BP-31A Sitework/Landscaping.
A non-mandatory Pre-bid Meeting and HUB Outreach session will be held at 3:00 p.m. Thursday, January 5, 2017.
Attachment | Size |
---|---|
UNCC Scott Hall – Notice to Bid – Final (2).pdf | 257.77 KB |
394.79 KB |