Science Building Early Package 2 (RUP/ Data Center/Site) – 1st Tier Subcontractor Prequalification

Balfour Beatty Construction will be accepting 1st Tier Subcontractor Prequalification forms until 2:00 p.m. Friday, May 18, 2018 for the following trade packages; 01B Final Cleaning; 02A Demolition & Abatement; 03A Concrete; 04A Masonry; 05A Structural Steel/Misc Metals; 07A Waterproofing/Caulking; 07B Roofing; 08A Doors/Frames/Hardward; 08C Overhead Doors; 08D Louvers; 09G Painting; 21A Fire Protection; 22A Plumbing; 23A HVAC; 23B TAB; 26A Electrical; 31A Sitework.

Balfour Beatty Construction will be hosting a HUB Outreach & Information Session to discuss the prequalification process, overall project schedule and bid package opportunities on Thursday, May 3, 2018 at 3:00 p.m.

Outreach presentation posted to this site May 7, 2018.

Attachment Size
PDF icon Advertisement for UNCC website for RUP final (2).pdf 61.37 KB
File CMR 1st Tier Prequal Form RUP -Final.docx 47.7 KB
PDF icon Science HUB Outreach and Information Session-Revised.pdf 121.12 KB
PDF icon UNCC Science Building Outreach 5.3.2018.pdf 15.81 MB