Construction Manager at Risk- FRIDAY-HVAC CONTROLS & ELECTRICAL UPGRADE

Submittals are due by 2:00 p.m., November 30, 2023.

Do not transmit any submittal information via email. Please deliver one copy of the submittal, along with one electronic copy in pdf format USB.

A Pre-Proposal Meeting will be held at 2:00 p.m. November 16, 2023 in the Facilities Operations and Parking (FOPS) building # 0092 on the campus map – http://facilities.charlotte.edu/maps),
Room 123.

Project Description:

The Friday building is home to the Belk College of Business and was built in 1981 and expanded in
1994. A completely new roof was installed in the summer of 2023.
The project for HVAC & Controls will be completed via phased construction in an occupied building:
The work to be completed in the facility includes:
1. New BACNET controllers for all HVAC equipment
2. Upgrade chilled water and hot water bridge and controls (including new VFD’s for pumps)
3. Replace existing AHU-1 and AHU-2 with one single duct unit with fan wall (including associated
VFD’s)
4. Replace rooftop air handling units (current design intent is to replace them 1 for 1 with similar
unit size/capacity with new controls)

5. Replace 1st and 2nd floor dual duct VAVs with single duct VAVs with hot water reheat
6. Replace 3rd floor electric VAV’s with hot water VAV’s (to the extent construction budget allows)
7. Provide hot water distribution to new VAV reheat coils
8. Upgrade fire alarm system to current code on 1st and 2nd floor
9. Provide architectural support scope for building code summary and minor patch/repair work in
support of scope of work.

Submittals shall be addressed to:
La’Keya Hewlin
The University of North Carolina at Charlotte
Planning, Design and Construction
2nd Floor-Facilities Management
9151 Cameron Blvd
Charlotte NC 28223-0001

Attachment Size
File Friday HVAC & Controls CM@Risk RFQ Revised 11-8-2023.docx 32.22 KB