Commissioning Agent for Atkins Library Tower ADA & Fire Smoke System Upgrades
Submittals are due by 2:00 p.m., Thursday, February 16, 2023.
Do not transmit any submittal information via email. Please deliver one copy of the submittal, along with one electronic copy in pdf format USB.
PROJECT DESCRIPTION:
The ADA scope will include: enlarging the two existing elevator shafts and replacing the elevators to meet ADA requirements, renovating the existing tower restrooms to meet building code and ADA requirements, replacing finishes to include paint and carpet for areas disturbed by the project improvements, and upgrading telecommunications/electrical/HVAC equipment as required for the ADA improvements.
The fire/smoke system upgrades scope will include: repairs and replacement of components associated with the buildings atrium and high-rise smoke control system, establishing a sequence of operations for the full building smoke control system, ensuring the complete building smoke control system operates as a single system, replacing or removing any failed or extraneous equipment, upgrading the dry valve in G76 which serves the dry sprinkler system at the loading dock, and replacing the fire pump controller.
Deliver Proposals to:
Attn: Mr. Attila Gergely
The University of North Carolina at Charlotte- Building 55
Facilities Management
9151 Cameron Boulevard
Charlotte, NC 28223
Attachment | Size |
---|---|
Atkins Tower ADA & F+S Cx RFQ.pdf | 274.23 KB |
684.3 KB |