Cameron Roof and Window Replacement
Submittals are due by 2:00 p.m., Thursday, February 9, 2023.
Do not transmit any submittal information via email. Please deliver one copy of the submittal, along with one electronic copy in pdf format USB
PROJECT DESCRIPTION:
The proposed project if for the design and construction of a roof and window replacement for Cameron
located on the UNC Charlotte campus. The proposed roof and window replacements are to improve
energy efficiency and reduce operation costs.
The 2 nd and 3 rd story roofs are proposed for replacement and are currently ballasted EPDM roofs and
approximately 35,000 SF in size total.
The existing fixed aluminum windows and curtain wall system need replacement and consist of
approximately 4,000 of glazing.
Any questions about the project should be directed via email to Jeanine Bachtel jbachtel@uncc.edu
Mailed Proposals:
Attn: Mrs. La’Keya Hewlin – Capital Projects
The University of North Carolina at Charlotte
Facilities Management – Capital Projects
9201 University City Boulevard
Charlotte, NC 28223-0001
Or
Hand Delivered:
Attn: Mrs. La’Keya Hewlin – Capital Projects
Facilities Management/ Police Building
2nd Floor – Capital Projects
9151 Cameron Boulevard
Charlotte, NC 28223
Attachment | Size |
---|---|
Cameron Roof and Window Replacement (1).pdf | 213.46 KB |