Atkins Tower ADA and Fire/Smoke Systems Upgrades- Prequalification of Subcontractors
Submittals are due to Barton Malow by April 3, 2024.
Project Description:
 The second and final phase of this project includes approximately 11,500 sqft of interior renovations required for
 ADA and Fire/Smoke System upgrades. The existing elevator and portions of the shaft will be removed to
 expand the footprint and install a larger elevator. Additional renovations for ADA compliance and upgrades to
 the Fire/Smoke system will take place on floors 1 through 10. This phase also includes restroom renovations on
 floors 5 through 10.
Contractors/Vendors are invited to pre-qualify for the following trade package(s):
 P2-02D – Selective Demolition
 P2-03A – Concrete
 P2-04A – Masonry
 P2-05A – Structural & Misc.
 P2-07B – Roofing
 P2-07H – Applied Fireproofing
 P2-08A – Doors, Frames & Hardware
 P2-09A – Drywall, Framing, and Ceilings
 P2-09C – Ceramic Tile
 P2-09D – Flooring
 P2-09G – Painting
 P2-10A – Signage
 P2-10B – Specialties
 P2-14A – Elevators
 P2-21A – Fire Protection
 P2-22A – Plumbing
 P2-23A – HVAC
 P2-26A – Electrical & Fire Alarm
 P2-35A – Final Clean
 P2-36A – General Trades
Submittals shall be submitted by email to Charles.Littrell@bartonmalow.com & tim.murphy@bartonmalow.com
or addressed to:
 Barton Malow Builders- Attention: Charles Littrell
 2322 Dunavant St., Suite #100
Charlotte, NC 28203
| Attachment | Size | 
|---|---|
|  Atkins Tower Pre-qualification Advertisement (1).pdf | 99.5 KB | 
|  Atkins Prequalification – Part A (1).pdf | 120.01 KB | 
|  Atkins Prequalification – Part B (1).pdf | 66.71 KB | 
|  CMR_Prequal_Matrix (1).pdf | 128.28 KB |