Atkins Tower ADA and Fire/Smoke Systems Upgrades- Prequalification of Subcontractors
Submittals are due to Barton Malow by April 3, 2024.
Project Description:
The second and final phase of this project includes approximately 11,500 sqft of interior renovations required for
ADA and Fire/Smoke System upgrades. The existing elevator and portions of the shaft will be removed to
expand the footprint and install a larger elevator. Additional renovations for ADA compliance and upgrades to
the Fire/Smoke system will take place on floors 1 through 10. This phase also includes restroom renovations on
floors 5 through 10.
Contractors/Vendors are invited to pre-qualify for the following trade package(s):
P2-02D – Selective Demolition
P2-03A – Concrete
P2-04A – Masonry
P2-05A – Structural & Misc.
P2-07B – Roofing
P2-07H – Applied Fireproofing
P2-08A – Doors, Frames & Hardware
P2-09A – Drywall, Framing, and Ceilings
P2-09C – Ceramic Tile
P2-09D – Flooring
P2-09G – Painting
P2-10A – Signage
P2-10B – Specialties
P2-14A – Elevators
P2-21A – Fire Protection
P2-22A – Plumbing
P2-23A – HVAC
P2-26A – Electrical & Fire Alarm
P2-35A – Final Clean
P2-36A – General Trades
Submittals shall be submitted by email to Charles.Littrell@bartonmalow.com & tim.murphy@bartonmalow.com
or addressed to:
Barton Malow Builders- Attention: Charles Littrell
2322 Dunavant St., Suite #100
Charlotte, NC 28203