Atkins AHU 3 Repair
Submittals are due by 2:00 p.m., Tuesday, March 7, 2023.
Do not transmit any submittal information via email. Please deliver one copy of the submittal, along with one electronic copy in pdf format USB.
PROJECT DESCRIPTION:
The project will include the design scope of the following items:
Mechanical System
-
Design and specifications for temporary spot type coolers/ rental units to support the existing load requirements
-
Design will include removal and disposal of existing coils and piping and any deteriorated drain pan material and subflooring.
-
The scope of work will include installing new cooling coils,new stainless steel drain pans, new subflooring and new condensate piping. and new fire-smoke dampers/actuators downstream of the air handler.
Control System
-
Design team shall conduct Retro-commissioning to identify system deficiencies.
-
Controls design shall include upgrading the existing controls and Tridium JACE network controllers with new BACnet IP/MSTP controllers, replacement of existing pneumatic controls to electric, existing Ahu sensors and control valves and damper actuators.
-
Provide new secondary BACnet/MSTP and/or BACnet/IP communications to DDC pan
-
Provide a full-scale building control system operating per the owner approved sequence of operation.
Electrical System
-
Replace Variable Frequency Drives: SF-1, SF-2, RF-1, RF-2.
Deliver Proposals to:
Attn: Mrs. La’Keya Hewlin
The University of North Carolina at Charlotte
Capital Projects
Facilities Management
9151 S Cameron Blvd.
Charlotte, N.C. 28223-0001